Accessible Drinking Fountain

Fall 2023

Two people drinking from a green outdoor drinking fountain amid trees

The Green Initiative Fund (TGIF) helped support the SLLC in installing an accessible water fountain and bottle fill station. While originally slated for the Domes, SLLC staff supported students in relocating when the original site proved untenable (fountain installed April ‘25; fill station installed March ‘26).
 

SLLC North

Spring 2021 

A student-written Stewardship Plan for the SLLC North Entry in 2021 - 2022, along with native plantings on Blue Ridge Rd. (still in bloom seasonally) and an entryway/connection to newly-rebuilt Orchard Park